Wednesday, 11 January 2012

New Parish Hall SS Peter and Paul Mitcham


A brief walkthrough of our initial proposal for the new Parish Hall at SS Peter and Paul RC Church. Taking the site conditions, typologies of the Roman villa and early basilicas, and timber trabeated structure, the plan is organised around an atrium at its centre providing light and ventilation and planted with shrubs and lavender and   the Parish Pastoral Council meeting room forming a new public front to the (sub) urban space adjacent to the existing Presbytery and Church. The multi-use hall is situated to the rear, opening up to the garden. The slides from the initial presentation can be downloaded here.

Its all very preliminary and unrefined, proportions, sizes of rooms, materials and details will be developed along with a more detailed analysis of the programme and liaison with the client and statutory bodies. (all work copyright Satmoko Ball Ltd. Jan 2012)

Friday, 9 September 2011

Lateralisms Volume III: The Recovery of Meaning





















Above work by Jay Mistry and below by Madeline Pope, students of our final year diploma unit at the University of Nottingham.








The book showing the work of the unit put together by the students, is now available for download here.

Thursday, 28 July 2011

Pylon Design Competition


















Our timber pylon entry for the above. Conceived laterally with a strong environmental agenda; a light touch concrete free footing which has half of the ground loading of a 16 stone man, a hanging hedgerow providing protected habitat and 30 tonnes of ballast (inspired by Salisbury Cathedral spire), an engineered timber structure sourced from the UK and of course a high level wind turbine.



















Full competition panel here.

Thanks to Ron, Barney, Doug and Phil for their input.

Saturday, 18 June 2011

Lateralisms 3




















Its the end of the academic year. We looked at Portland again in final year Diploma with a variety of student derived sites and programmes. Photos of the work here.

Thursday, 26 May 2011

Hammersmith House Phase 2 Development





























We're reworking an earlier project in line with changes to our client's brief. These are initial plan sketches we ran through in a recent meeting together with a rough 3d computer model.




























Now linking 3 flats to form one dwelling, earlier thematics related to the Balinese compound as a microcosm of urban space, figure/ground and layered threshold are maintained. A top lit atrium/internal garden has been added as a link between buildings.

Looking forward to working up the drawings.